Pow Wood April 2022

Plots 1&2 front Plots 1&2 rear Plots 1&2: First fix and all exterior render completed. Paving with slabs on terrace underwayPlots 3&4: Completed second fix joinery, plumbing and electrical except in the bathroom

March 2022

Plots 1&2: All windows installed. Plumbing and electrical fitting, and exterior render underway. Gas service connected Plots 3&4: Joinery, plumbing and electrical installations underway. Gas service connected and interior decorated

2 Pow Wood

We have reopened for applications to purchase 2 Pow Wood. If you are interested please email SecretaryADCLT@btinternet.com for an information pack Applications must be submitted to the Secretary by Friday March 25.2022

January 2022

Plots 1&2: Roof slates, verges, ridge tiles and photo voltaic cells installed, ground floor insulation and floor screed completed and window fitting started Plots 3&4: Walls and ceilings plastered, staircases fitted, cabinets and worktops installed in kitchen and utility and exterior render completed

As 2021 closes

Plots 1&2: framework for dormer windows, soffits and facias and roof membrane are complete The rear of plots 1&2 Plots 3&4: most interior plasterboarding completed and exterior render started Plot 3 Plot 4